Belgrade Theatre, Coventry: air conditioning installation and enhancement

Belgrade Theatre, Coventry: air conditioning installation and enhancement

Belgrade Theatre Project, Coventry

Belgrade Theatre, CoventryDesigned in conjunction with: Lawrence:King Architects
Belgrade Theatre air conditioning installationAir conditioning installation
Belgrade Theatre air conditioning systemOR Consulting Engineers air conditioning

Designed in conjunction with: Lawrence:King Architects, Momentum Structural Engineers.
Client: ESS
Pictures courtesy of Lawrence:King Architects

The Belgrade Theatre Project involved the fit-out design of the B2 Auditorium. OR Consulting Engineers were tasked with establishing the performance of the base build air conditioning installation and identifying measures to enhance its performance.

OR Consulting Engineers undertook a design study to:


From this study, OR Consulting Engineers developed an enhanced air distribution strategy which:


This enhanced strategy allowed the delivery of cool air to be focused within the occupied zones, where it was needed. This approach increased the maximum occupancy within the auditorium from 230 to 300 people, without increasing the cooling capacity of the plant.

More projects

 

OR Consulting Engineers
Central House, 4th Floor
25 Camperdown Street
London
E1 8DQ

020 8616 0062
info@orconsult.co.uk